32049591R: Boiler violation issued

Building violation issued details

Location 152-01 ROCKAWAY BOULEVARD, QUEENS
Issue date May 19, 2006
ECB violation number 32049591R
Infractions B4A: Failure to maintain boiler

Inspectors in the Boiler Division issue this type of violation. This violation is issued either as a result of a complaint, as a result of a scheduled inspection for an application, or as part of a review of previously issued violations. It is the most common type of all boiler violations issued by inspectors. The violation is used when any part of the boiler is not in a safe condition. The owner is responsible at all times for the safe maintenance of the building and its facilities. The violation can be "Cured" if no hearing has yet been held and it is not a hazardous or second offense violation.

BQ9: Boiler installed, altered, repaired or used without a permit
Is active No
Violation type Boiler

Violations related to boilers, a common heating device where water is converted to steam. Common infractions relate to improper maintenance (dirty boilers) and lack of fire door on a boiler room, which is a hazardous condition.

Description B4A,BQ9,36,16,50,50A,50B,50C,50D. BQ9-36-NEW GAS(CGI-3 WEIL MCLAIN) HEATING BOILER #01 INSTALLED W/O ANY PERMITS FOR 2ND FL IN OPERATIONS OFFICE.50-BOILER WATER FEED IS FED DIRECTLY TO BOILER.
Severity Moderate
Compliance status Cure accepted

Added to EveryBlock on May 19, 2006.