32049590P: Boiler violation issued

Building violation issued details

Location 152-09 ROCKAWAY BOULEVARD, QUEENS
Issue date May 19, 2006
ECB violation number 32049590P
Infractions B4A: Failure to maintain boiler

Inspectors in the Boiler Division issue this type of violation. This violation is issued either as a result of a complaint, as a result of a scheduled inspection for an application, or as part of a review of previously issued violations. It is the most common type of all boiler violations issued by inspectors. The violation is used when any part of the boiler is not in a safe condition. The owner is responsible at all times for the safe maintenance of the building and its facilities. The violation can be "Cured" if no hearing has yet been held and it is not a hazardous or second offense violation.

Is active No
Violation type Boiler

Violations related to boilers, a common heating device where water is converted to steam. Common infractions relate to improper maintenance (dirty boilers) and lack of fire door on a boiler room, which is a hazardous condition.

Description B4A,16,50,50A,50B,50C,50D,50E,39.50-SOOT COLLECTING ALL AROUND TOP OFBOILER. 50A-CHIMNEY BASE NEEDS TO BE SEALED,OPENED UP AROUND FLUE TOBASE OF CHIMNEY.50B-BOILER RELIEF VALVE NOT VERTICAL POSITION/UPRIGHT
Severity Moderate
Compliance status Cure accepted

Added to EveryBlock on May 19, 2006.

More information about this violation on nyc.gov